7.8.11 Grand Staircase & Under Jackson Plaza

Please download to get full document.

View again

of 22
10 views
PDF
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Document Description
1. Phase 2A<br />In this slide show: <br />Grand Staircase & <br />Under Jackson Plaza<br />July 8, 2011<br /> 2. The Jackson Plaza is…
Document Share
Documents Related
Document Transcript
  • 1. Phase 2A<br />In this slide show: <br />Grand Staircase & <br />Under Jackson Plaza<br />July 8, 2011<br />
  • 2. The Jackson Plaza is now partially opened to the public. <br />
  • 3. Restoration of the Grand Stairs is nearly complete and will be open soon.<br />
  • 4. The black light post illuminates the plaza. Historic replicas of the original cast iron lights on the granite balustrade will be added later. <br />
  • 5. New flower baskets, lighting and gutters installed under the north side canopy. <br />
  • 6. This partial test-piece shows reproduced historiccopper flashings to be installed along the north and west canopy trim. <br />
  • 7. All chains supporting the canopy will be restored and painted. <br />
  • 8. Site of the 31 new geothermal wells. The wells are connected and reach the mechanical room under the plaza. <br />
  • 9. Terrazzo steps for the Grand Stairs delivered onsite for installation. <br />
  • 10. The Grand Stairs will be open to the public by fall 2011. <br />
  • 11. Stainless steel hand rails installed on the rehabilitated Grand Stairs. <br />
  • 12.
  • 13. The Grand Stairs provide access to the main waiting room and new baggage and ticket areas. <br />
  • 14. Installation of wooden counters in the baggage and ticketing area is underway. <br />
  • 15.
  • 16. Columns and structural shear wall recently painted for extra durability. <br />
  • 17. Electric lift will provide access for disable personnel from terminal level to Amtrak break room. <br />
  • 18. Lift seen from mezzanine level. <br />
  • 19. Steel guards provide safety when viewing the track. <br />
  • 20. New west side geothermal wells are waiting to be connected to the rest of system. <br />
  • 21. The geothermal wells will provide 100 percent heating and cooling for the entire building. <br />
  • 22. New guard plates were installed to protect structural columns along Jackson Street. <br />
  • Search Related
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks
    SAVE OUR EARTH

    We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

    More details...

    Sign Now!

    We are very appreciated for your Prompt Action!

    x