DESIGN REALISATION
DESIGN AND DETAIL
ARCT 1054chris kelly, unit 15
 
CONTENTSGYM
energy cellspods keykalwall precedentkalwall performancepod constructionconnection to superstructurelighting strategy - nightplugin cellsheating & coolingCINEMAhanging above the marketstructure - shellsuspended within framestructure - suspensionsuspension steel connectionsexploded axonometricwall constructionfloor constructionroof constructionexternal claddingcinema contrastacousticsheating schematichall ventilation - heatinghall ventilation - coolingpart m
ENERGY SYSTEMSthe bodyenvironmental overviewpavegen precedentpavegen - marketwalkway pressure padsgreen gym - precedentenergy calculationsjoint bracesmasksurine electrolysiscooling systemfire performanceINTRODUCTIONproject outlineclienturban context - high street 2012high street 2012 initiatives64-68 whitechapel high streetproposed siteproject timelineurban context - failing high streeturban context - encroaching developmenturban strategy - historical grainurban strategy - high streetprogrammeKEY SPACEShigh streetmarket areaexhibition spacecinema suspendedenergy cellsgym - visual connectiongreenhouse - energy cultivationcirculationscheme diagramGENERAL ARRANGEMENT DRAWINGSbasement planground floor planfirst floor plansecond floor planthird floor plansection asection bperspective section cperspective section dSUPERSTRUCTUREbasement & ground floorsteel frame & circulationpods & cinemafacadesteel frameFACADEfacade renderelgin marbles precedenthistorical photosbreaking down facaderecreating the facaderecreating the facade cont.moment connectionskey views - aldgate eastkey views - osborn streetkey views - whitechapel high streetGROUND FLOORlink to high streetmarketexhibition spacetransformationCIRCULATIONexternal spacemovementfoyerstructurepressure padsexposed serviceslighting strategy - daylighting strategy - night8.08.18.28.38.48.58.68.78.88.99.09.19.29.39.49.59.69.79.89.99.109.119.129.139.149.159.1610.010.110.210.310.410.510.610.710.810.910.1010.1110.124.04.14.24.34.44.55.05.15.25.35.45.55.65.75.85.95.106.06.16.26.36.47.07.17.27.37.47.57.67.77.81.01.11.21.31.41.51.61.71.81.91.101.111.122.02.12.22.32.42.52.62.72.82.93.03.13.23.33.43.53.63.73.83.9
 
PART 1
INTRODUCTION
 
the project is a experimental building which looks intohow energy systems can be utilised within a building tocreate energy from the interaction of the human bodywithin the spaces.the project is for edf energy as part of the high street2012 scheme for the london 2012 olympic games. edfare the official energy suppliers to the games and arelooking to undertake projects to demonstrate thedevelopment of technologies and create interactiveenvironments for the users. the project will belaunched during the 2012 olympics as a landmarkproject in the east end of london showing how humanpowered buildings can be possible.
1.1 PROJECT OUTLINE
we are proud to be an official partner and the official electricity supplier of the london 2012 olympic and paralympic games.we are using the power of the olympic games to encourage people to change the way they think about and use energy.we will deliver our low-carbon vision for london through the development of several innovative projects that will leave a positive legacy beyond the london 2012 games.we are helping to create a community and environmental legacy for the games, working with young people in london through the legacy champions programme 
edf energyhttp://www.edfenergy.com/about-us/sponsorship/london-2012
of 106