KISHORCHANDRA N. YAYA P.O. BOX 83309- 80100 MOMBASA ENVIRONMENTAL IMPACT ASSESSMENT PROJECT REPORT FOR THE PROPOSED ALTERATION AND EXTENSION OF EXISTING BUILDING ON PLOT NO 3537/1/MN NYALI, MOMBASA COUNTY Kishorchandra N. Yaya Proposed alteration and extension of existing building- Nyali ____________________________________________________________________________________________ NOVEMBER 2011 DOCUMENT OF AUTHENTICATION This project report has been prepared and compiled by a NEMA registered
Document Share
Document Tags
Document Transcript
  KISHORCHANDRA N. YAYAP.O. BOX 83309- 80100MOMBASA ENVIRONMENTAL IMPACT ASSESSMENT PROJECT REPORT FOR THEPROPOSED ALTERATION AND EXTENSION OF EXISTING BUILDING ONPLOT NO 3537/1/MN NYALI, MOMBASA COUNTY  Kishorchandra N. Yaya Proposed alteration and extension of existing building- Nyali ____________________________________________________________________________________________  NOVEMBER 2011 DOCUMENT OF AUTHENTICATION This project report has been prepared and compiled by a NEMA registered E.I.A Expertswhose names and registration number appear below. It has equally been read andapproved by the proponent whose name and other particulars appear below. Both theexpert and the proponent approve of the contents by appending signatures as below: NAME OF E.I.A EXPERT Signature MAKAZI MBWIYA (0973CELL PHONE NUMBER: 0722 216113PETER OLUOCH (2524)CELL PHONE NUMBER: 0727841483 NAME OF PROPONENT REPRESENTATIVE: DAN MBUGUHUSIGNATURE:…………………………….......................................DATE:…………………………………….......................................  ______________________________________________________________________________________ Makazi Mbwiya & peter oluoch OumaNovember 2011  Kishorchandra N. Yaya Proposed alteration and extension of existing building- Nyali ____________________________________________________________________________________________  EXECUTIVE SUMMARY The proponent of the Proposed Project has proposed to alter and extend the existing building to first and second floor on plot number 3537/1/MN. Upon completion Theentire block will consist of three floors upon completion. Currently The design of theexisting building is as follows; Ground floor; four bedroom house with kitchen and dining area . Proposed alteration and extension on 1 st and 2 nd floor entails 1  st  floor; master bedroom, three other bedrooms, living room, dining area, kitchen, store, prayer room and balcony.The building will have a terrace finish with a pent house. Total build up area will be671.89 Sqm Project Cost and description Cost estimates for the proposed project include actual construction costs, costs of  processing licences and other statutory approvals and contingencies. It is estimated thatthe proposed extension of existing to 2 nd floor with 2 units of three bedroom each willcost Ksh 6,500,000/=.i Makazi Mbwiya & Peter.O.Ouma  Kishorchandra N. Yaya Proposed alteration and extension of existing building- Nyali ____________________________________________________________________________________________  TABLE OF CONTENT 1. BACKGROUND OF THE PROJECT .............................................................................1 1.1 P ROJECT D EFINITION ...................................................................................................11.2 L OCATION ...............................................................................................................11.3 P ROJECT P ROPONENT ...................................................................................................11.4 P ROJECT   OBJECTIVE .....................................................................................................11.5 M OMBASA C OUNTY B ASELINE I NFORMATION .........................................................................1 1.5.1 Introduction .................................................................................................11.5.2 Climate .......................................................................................................21.5.3 Settlement Patterns ...................................................................................21.5.4 Environmental challenges by the County ....................................................21.5.5 Recent challenges: ......................................................................................4 2. POLICY AND LEGAL FRAMEWORK ........................................................................ 1 2.1 P OLICY   AND L EGAL F RAMEWORK  ......................................................................................1 2.1.1 The Physical planning Act ............................................................................12.1.2 The Local Authorities Act ............................................................................12.1.3 The Public Health Act ..................................................................................22.1.4 Environmental Management and Co-ordination Act (EMCA) 1999 ...............22.1.5 The Environmental Management and Coordination (Water Quality) ...........3Regulations, 2006 ................................................................................................32.1.6 The Environmental Management and Coordination (Waste Management)Regulations, 2006 ...............................................................................................32.1.7 Employment Act 2007 .................................................................................42.1.9. Occupational Safety and Health Act 2007 ..................................................5 3. PROJECT DESIGN .........................................................................................................1 3.1 C OMPOSITION ..........................................................................................................13.2 C ONSTRUCTION E QUIPMENT , M ATERIALS , U  TILITIES   AND W ASTE ..................................................1 3.2.1 Equipment ...................................................................................................13.2.2 Materials .....................................................................................................13.2.3 Utilities ........................................................................................................23.2.4 Waste ..........................................................................................................2 3.3 W ASTE M ANAGEMENT   AND D ISPOSAL ................................................................................3 3.3.1 Construction waste ......................................................................................33.3.2 Waste from sanitary facilities ......................................................................33.3.3 Kitchen waste ..............................................................................................3 3.4 T ECHNOLOGY    TO   BE   USED .............................................................................................3 3.4.1 Dust Control Technology .............................................................................33.4.2 Noise Reduction Technology .......................................................................4 3.5 P ROJECT C OST ..........................................................................................................4 4.0 ANALYSIS OF PROJECT ALTERNATIVES .............................................................1 4.1 N O P ROJECT   ALTERNATIVE .............................................................................................1 i Makazi Mbwiya & Peter.O.Ouma
Similar documents
View more...
Search Related
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x