Document Description
my work pert cpm
Document Share
Document Tags
Document Transcript
  ActivityPrecedes 1Pre-Construcon Phase21 days1.1 PERMITS19 days 1.1.1  Building Permit 15 days1.1.2  Fence Premit 2 days1.1.3  Temporary Power Connection 2 days1.1.4  Temporary Water Connection 2 days 1.2 MOBILIZTIO! 1.1 2 days 1.2.1  Temporary Facilities 1.12 days 2Construcon Phase1 # days2.1 L$O%T 1 2 days 2.1.1  Site / Staking 1.2.12 days 2.2 ERT&'OR(S 2.1.1 ) days 2.2.1  Clearing/Grabbing/Hauling 2.2.11 day 2.2.2 E*ca+aon 2.2 , days 2.2.2.1  Column Footing 2.2,2.12 days2.2.2.2  Wall Footing & Footing Tie Beam 2.2,2.12 days2.2.2.3  Septic Tank 2.2,2.12 days2.2.2.4  Soil Poisoning 2.2,2.12 days2.2.2.5  Backlling 2.2,2.12 days 2. CO!CRETE 'OR(S 2.2.2 2# days2..1 oundaon 2.5 2# days 2.3.1.1  Footing 2.5.16 days2.3.1.2  Wall Footing 2.5.26 days2.3.1.3  Footing Tie Beam 2.5.36 days2.3.1.4  Slab on Grade 2.5.34 days2.3.1.5  !/F Floor Slab 2.5.44 days EXPECTED TIME (DURATION)  2.3.1.6  !/F Column 2.5.56 days2.3.1.7  !/F Beams/ oo# Beams 2.5.66 days2.3.1.8  Stairs 2.5.74 days2.3.1.9  Septic Tank 2.2.23 days 2., REBR 'OR(S 2.2.2 21 days 2.4.1  Column Footing 2.2.28 days2.4.2  Wall Footing 2.2.28 days2.4.3  Girders$ Beams$ oo# Beam 2.2.213 days2.4.4  Stairs 2.2.24 days 2.) ORM'OR(S 2.4 2# days 2.5.1  Footing 2.44 days2.5.2  Wall Footing 2.44 days2.5.3  Footing Tie Beam 2.44 days2.5.4  !/F Floor Slab 2.44 days2.5.5  !/F Column 2.44 days2.5.6  !/F Beams/ oo# Beams 2.44 days2.5.7  Stairs 2.44 days 2./ MSO!R$ 2.3 1) days2./.1 0round oor 2.3.1 / days 2.6.1.1  Placing o# Concrete Hollow Blocks 2.3.16 days 2./.2 Second oor 2.3.1 9 days 2.6.2.1  Placing o# Concrete Hollow Blocks 2.3.19 days 2./. 0round oor 2.6.1 ) days 2.6.3.1  GF & !F Plastering 2.6.15 days 2./., Second oor 2.6.1 / days 2.6.4.1  GF & !F Plastering 2.6.16 days 2. ROOI!0 'OR(S 2.6  days  2.7.1  Trusses$ Purlins and G% S'eet Placing 2.63 days 2. 'TER PROOI!0 2.6 1 day 2.8.1  Waterproong o# (oisture prone areas 2.61 day 2.9 I!IS&I!0 'OR(S 2.7,2.8 12 days 2.9.1  )oors and Windows 2.7,2.83 days 2.9.2 Ce33n4 'or5s 2.6 12 days 2.9.2.1  nstallation (etal Furring 2.68 days2.9.2.2  nstallation o# Gypsum board 2.64 days 2.9. oor 3n3sh3n4 2.6,2.8 9 days 2.9.3.1  Granite Tiles 2.6,2.86 days2.9.3.2  *on gla+ed tiles ,-itc'en topd T & B. 2.6,2.83 days 2.1 PI!TI!0 'OR(S 2.6 1, days 2.10.1  *eutrali+er application 2.67 days 2.1#.2 0round oor 2.6 1, days 2.10.2.1  0terior 2.67 days2.10.2.2  nterior 2.67 days 2.1#. Second oor 2.6 1, days 2.10.3.1  0terior 2.67 days2.10.3.2  nterior 2.67 days 2.11 PL%MBI!0 'OR(S 2.2,2.6, )) days 2.11.1   oug'ing1n 2.23 days2.11.2  Waterline 2.2,2.63 days2.11.3  Sewer 2ine 2.2,2.64 days2.11.4  )rainage 2ine 2.2,2.61 day2.11.5  Septic Tank 2.2,2.63 days2.11.6  Fi0ture nstallation 2.2,2.6,2.93 days 2.12 ELECTRICL 'OR(S 2.2,2.3 ), days  2.12.1   oug'ing1n 2.2,2.39 days2.12.2  Fi0ture nstallation 2.2,2.32 days 2.1 %R!IS&I!0 2.1 9 days 2.13.1  -itc'en Cabinet 2.1,2.6,2.93 days2.13.2  Bedroom Closet 2.1,2.6,2.93 days2.13.3  Walk in Closet 2.1,2.6,2.93 days2.13.4  T3 table 2.1,2.6,2.93 days Post-Construcon Phase1 days 3.1  Punc' 2isting 2 days3.2  Final nspection 3 days3.3  4s Built Plan 2 days3.4  Certicate o# 5ccupancy 10 days3.5  )emobili+ation 2 days3.6  Turno3er o# Pro6ect 2 days
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x