LAMS Aeroplane (v2.0) - Annex II Aircraft

Please download to get full document.

View again

of 9
48 views
PDF
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Document Description
ACS Engineering CAA/LAMS/A/1999 Issue 2 SECTION 8 - SCHEDULED MAINTENANCE WORKSHEETS Maintenance Organisation Name: Site where maintenance was accomplished: Reg: Engine Type: Propeller Type: Total Hours: Check type: Cycles/Landings: [50 FH/6 Months] ACS Aviation Ltd Perth S/N: S/N (single): S/N (single): Check start date: [150 FH] [Annual] [LH]: [LH]: Operator: [Annual / Star Inspection] Page 1 of Note: Enter total pages issued Workpack Ref: [R/H]: [R/H]: Note: Delete checks which are not being
Document Share
Documents Related
Document Tags
Document Transcript
   ACS Engineering  CAA/LAMS/A/1999 Issue 2 SECTION 8 - SCHEDULED MAINTENANCE WORKSHEETS Maintenance Organisation Name: ACS Aviation Ltd Page 1 of Site where maintenance was accomplished: Perth Note: Enter total pages issuedReg:S/N:Workpack Ref:Engine Type: S/N (single):[LH]:[R/H]:Propeller Type:S/N (single):[LH]:[R/H]:Total Hours: Cycles/Landings:Check start date:Check type:[50 FH/6 Months][150 FH][Annual][Annual / Star Inspection]Note: Delete checks which are not being carried out and identify any not applicable worksheet tasks as N/AMaintenance Manual ReferenceIssue/Revision NumberDateAirframe:Engine:Propellor  Ground Run:Task NoTask DescriptionTask NatureTask IntervalInsp1INSPAll Checks2OP/CAll Checks3CHKAll ChecksCertification:4CHKAll checksN/AType Certificate and Schedule Review:5CHKAnnualN/A6Mandatory placards are installed and legible.CHKAnnualN/A7CHKAnnualN/A* See Sections 4 or 5 as appropriate. CERTIFICATE OF RELEASE TO SERVICE Operator:   FINAL CHECKS (INCLUDE WITH ALL CHECKS) - Task Nos 1 - 7 CertifyingPersonPower plant, liquid, air and gas systems for leaks during and followingground run.Instruments, systems and services. Radio for electromagneticinterference.Following ground run, ensure all cowlings, access panels and doors aresecure.Workpack and Log Book entries have been completed and certified.Ensure items due in accordance with CAP543 have been accomplishedand certified.Aircraft and engine - compliance with Type Certificate DataSheet/Airworthiness Approval Note.Review the schedule to ensure that the maintenance needs of the aircraftare being met such that continuing safe operation can be assured.Account should be taken of previous maintenance history, operatingenvironment and utilisation. The work recorded above has been carried out in accordance with the requirements of the ANO for the time being in force and in thatrespect the aircraft/equipment is considered fit for release to service.  Job No.: Page 2 of  A/C Type: A/C Reg: A/C Hours: Structure/Zonal:Task NoTask DescriptionTask NatureTask IntervalMechInsp8INSP9Surface de-icer systemINSP10INSP11Doors, hatches, windows and latching and lockingOP/C12INSP13OP/C14INSP15Marine Aeroplanes: Water Rudder SystemOP/CLanding Gear:16INSP17Tyre pressures, hydraulic brake system fluid level.SERVICEFlying Controls:18OP/CLiquid, Air and Gas Systems:19Hydraulic, pneumatic, vacuum, other fluid systems.INSP20Fluid levels in reservoirs, accumulator pressures.SERVICE21INSPEquipment and Environmental:22Correct stowage of equipment, validity of date on emergency equipment.CHK23Seats, belts/harnesses, attachment, locking and release.INSP24Fire extinguisher for leakage or discharge.CHKAeroplane Lubrication25LUBPowerplant Installation:26OP/CLH:RH:27Powerplant installationINSPLH:RH:Air Induction28Air filter, intake and induction system, turbocharger impellor.INSP CERTIFICATE OF RELEASE TO SERVICE 50 HOUR CHECK - Task Nos 8 - 28External structure of cabin, centre section, tail boom, cowlings, nacelles,stabilisers, surfaces, flaps and other high lift devices.50 FH/6Months50 FH/6MonthsNormal & emergency windows and doors, door hinges, door hingeattachment points, required placards and operating instructions50 FH/6Months50 FH/6MonthsAgricultural installations: Hopper, hopper lid, tank, pump, fan, boomassemblies, pipe runs, blowers and spreaders.50 FH/6MonthsAgricultural installations: Emergency dump doors, fan brake, pumpcontrol.50 FH/6MonthsMarine aeroplanes: Hull, floats, spreaders, struts, bracing wires, water rudders, alighting gear, bilge compartments50 FH/6Months50 FH/6MonthsLanding gear assemblies, shock absorber struts/units for leaks andcorrect extension, brake system, brake linings, drum/discs, wheels, tyres.50 FH/6Months50 FH/6MonthsPrimary/secondary flight controls and trim systems for full and freemovement in the correct sense, position indicators agree with surfacemovement.50 FH/6Months50 FH/6Months50 FH/6MonthsPitot/static system vents, pitot head, drains clear. Pitot head correctlyaligned.50 FH/6Months50 FH/6Months50 FH/6Months50 FH/6MonthsLubricate aeroplane in accordance with type design organiastionrecommendations50 FH/6MonthsEngine and propellor controls for full and free movement -throttle,mixture, carburettor heat, cowl flaps, propellor 50 FH/6Months50 FH/6Months50 FH/6Months The work recorded above has been carried out in accordance with the requirements of the ANO for the time being in force and in thatrespect the aircraft/equipment is considered fit for release to service.  Job No.: Page 3 of  A/C Type: A/C Reg:A/C Hours: Exhaust:Task NoTask DescriptionTask NatureTask IntervalMechInsp29Exhaust manifold, mufflers.INSPEngine Lubrication:30Magnetic plugs.CHK31SERVICEOil type: Qty: B/N:Fuel System:32CHKPropellor 33Blades, spinner, backplateINSPLH:RH:34Accumulator dome pressureCHKLH:RH:Electrical System35Battery, stowage/ compartment, vents and drains. Electrolyte level36Alternator/ generator drive belt tension and conditionINSPRadio37INSP38Placards and markings legible.INSP39VHF ground function.OP/CHK40Cables and terminals, cooling systems, moisture trap areas.INSPInstrument Systems:41INSP & CHK42Readings consistant with ambient conditions.CHK43Compass deviation or steer by cards - valid until next check.CHKAuto-Pilot & Flight Detector 44Displays, instruments, controllers.INSP45Manual override, disengagement function.OP/CHK CERTIFICATE OF RELEASE TO SERVICE 50 HOUR CHECK - Task Nos 29 - 4550 FH/6Months50 FH/6MonthsEngine oil change. Oil filter. Screens. Note: In accordance with designorganisation recommendations.50 FH/6MonthsFilters for cleanliness and tank vents unobstructed. Drain samples fromall drain points and check for presence of water, foreign matter andcorrect colour.50 FH/6Months50 FH/6Months50 FH/6MonthsINSP &SERVICE50 FH/6Months50 FH/6MonthsAerials, insulators, controllers, instruments, displays, microphones,headsets, jack plugs and sockets.50 FH/6Months50 FH/6Months50 FH/6Months50 FH/6MonthsInstruments. Legibility of markings and associated placards, band rangesand limit markings.50 FH/6Months50 FH/6Months50 FH/6Months50 FH/6Months50 FH/6Months The work recorded above has been carried out in accordance with the requirements of the ANO for the time being in force and in thatrespect the aircraft/equipment is considered fit for release to service.  Job No.: Page 4 of  A/C Type: A/C Reg:A/C Hours:Structure/Zonal:Task NoTask DescriptionTask NatureTask IntervalMechInsp 46INSP150 FH47Internal corrosion, protective treatments, drain holes and pathsINSP150 FH48INSP150 FH49Static discharge wicks and attachment basesINSP150 FH Landing Gear:50INSP150 FH51 Main and parking brake systems, anti-skid devices OP/C150 FH52OP/C150 FH53 Hydraulic/ pneumatic operating system OP/C150 FHFlying Controls: 54INSP150 FH55Turnbuckles, locking devices in safetyCHK150 FH56Flap asymmetric protection mechanismsINSP150 FH Liquid, Air & Gas Systems 57INSP150 FH Equipment and Environmental 58Cabin air system, heater and blower INSP & OP/C150 FH59Air conditioner, oil level150 FH60Outflow valves, pressurisation controller, bleed system, shut-off valvesINSP150 FH CERTIFICATE OF RELEASE TO SERVICE 150 HOUR CHECK (INCLUDE FINAL CHECKS ITEMS 1- 7 & 50HR CHECK ITEMS 8 - 45) - Task No 46 - 60 Internal structure of fuselage, floors, bulkheads, tail booms, mainplanes,nacelles, empennage. Control surfaces, flaps and other high lift devices,structural attachment joint assemblies, struts, bracing wires and their attachments. Note: The need for removal of fabric for detailed inspectionof attachments must be assessed when accomplishing this task at theannual checkWooden/ Composite Construction: Vent holes, glued joints, bondedassemblies, protective treatments and finishes. Note: The need for removal of fabric for detailed inspection of attachments must be assessedwhen accomplishing this task at the annual checkStructural members, attachment fittings, pivot points, shock absorbingdevices, bungee rubbers, torque links, shimmy dampers, main wheels,nose / tail wheels, bearings, skids, hoses and lines, hydraulic and electricactuators, jacks, struts, wheel fairing. NOTE: Carry out with weight off landing gear.Normal/ emergency retraction and extension, locking devices, doors andoperating linkages, indicators, warning devicesHinges, brackets, push-pull rods, bell cranks, damper weights, controlhorns, cables, pulleys, chains, tubes, guides, fair leads, servo actuators.NOTE: the need for removal of flying control cables and control systemcomponents for detailed inspection must be assessed when accomplishingthis task at the annual check.Tanks, power packs, valves, pipe lines, hoses, actuators, filters andventuriisOP/C &SERVICE The work recorded above has been carried out in accordance with the requirements of the ANO for the time being in force and in thatrespect the aircraft/equipment is considered fit for release to service.
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks