Public Entreprise Elektroprivreda Bosne i Hercegovine d.d. -Sarajevo THERMAL POWER PLANT KAKANJ , KAKANJ Our mark, date: 01-12, 9 June 2008 Subject: MV SWITCHGEAR, LV SWITCHGEAR AND DISTRIBUTION TRANSFORMERS SPECIFICATION No. 1/06-zb-017/08 for goods SCOPE OF DELIVERY This specification covers design, engineering, manufacture, assembly, transport, testing before supply and delivery of MV switchgear, LV switchgear and distribution transformers for use of TPP “Kakanj” with all fittings, acce
Document Share
Document Tags
Document Transcript
  Public Entreprise Elektroprivreda Bosne i Hercegovine d.d. -Sarajevo THERMAL POWER PLANT KAKANJ , KAKANJ   Izdanje br.: 1 Izdava č : TE Kakanj OUK 74/03-04 Strana : 1/46 Our mark, date: 01-12, 9 June 2008Subject:  MV SWITCHGEAR, LV SWITCHGEAR AND DISTRIBUTION TRANSFORMERS   SPECIFICATION No.1/06-zb-017/08  for goods SCOPE OF DELIVERY This specification covers design, engineering, manufacture, assembly, transport, testing before supplyand delivery of MV switchgear, LV switchgear and distribution transformers for use of TPP “Kakanj” with allfittings, accessories, associated equipment and mandatory spares specified herein which are required forefficient and trouble free operation as specified here under.The equipment shall be modern designed and aim to make possibility of simple assembling, inspection,cleaning, maintenance, on site testing and repairs. It shall function satisfactorily under any operating conditionsand under the conditions that can be expected on the site.The Contractor shall carry out the Contract Works in accordance with sound quality managementprinciples, which shall include such controls as are necessary to ensure full compliance with all requirements of the Specification. The Contractor's activities will be monitored by the Purchaser to ensure that they are beingimplemented correctly.  Public Entreprise Elektroprivreda Bosne i Hercegovine d.d. -Sarajevo THERMAL POWER PLANT KAKANJ , KAKANJ   Izdanje br.: 1 Izdava č : TE Kakanj OUK 74/03-04 Strana : 2/46 CONTENTS: TS1.   GENERAL TECHNICAL REQUIREMENTS............................................................................................5   1.1   SCOPE OF DELIVERY.............................................................................................................................................5   1.2 STANDARDS AND CODES.....................................................................................................................................5   1.3   DESIGN......................................................................................................................................................................5   1.4   DOCUMENTATION.................................................................................................................................................6   1.4.1   Drawings sizes.................................................................................................................................................6   1.4.2   Marking of documentation..............................................................................................................................6   1.4.3   Scope of work documentation.........................................................................................................................6   1.4.4   Contents of the delivered documentation........................................................................................................6   1.5   PACKAGING AND TRANSPORTATION...............................................................................................................7   1.5.1   Packaging........................................................................................................................................................7   1.5.2   Shipping...........................................................................................................................................................7   1.5.3   Packing List.....................................................................................................................................................7   1.5.4   Shipping Marks...............................................................................................................................................7   1.6   SPARE PARTS..........................................................................................................................................................8   1.6.1   Spare Parts.......................................................................................................................................................8   1.7   MARKINGS...............................................................................................................................................................8   1.8   SUPERVISION AND TESTS....................................................................................................................................8   1.8.1   General............................................................................................................................................................8   1.8.2   Tests of producers............................................................................................................................................9   1.8.3   Standards and Rules of Testing.......................................................................................................................9   1.8.4   Supervision and Testing Procedures................................................................................................................9   1.8.5   Test witnessing..............................................................................................................................................10   1.9   CORROSION PROTECTION..................................................................................................................................10   1.10   TERMS.....................................................................................................................................................................10   1.11   GUARANTY............................................................................................................................................................10   TS2.   QUALITY ASSURANCE MANAGEMENT REQUIREMENTS AND SPECIAL TECHNICALREQUIREMENTS.....................................................................................................................................11   2.1   GENERAL................................................................................................................................................................11   2.2   SCOPE......................................................................................................................................................................11   2.3   DOCUMENTATION REQUIRED WITH TENDER..............................................................................................11   2.5   PARTICULAR REQUIREMENTS..........................................................................................................................11   2.5.1   Organization..................................................................................................................................................11   2.5.2   Planning.........................................................................................................................................................12   2.5.3   Design Control..............................................................................................................................................12   2.5.4   Procurement Document Control....................................................................................................................12   2.5.5   Documentation and Change Control.............................................................................................................12   2.5.6   Control of Purchased Material, Equipment and Services..............................................................................12   2.5.7   Control of Inspections and Tests...................................................................................................................12    Public Entreprise Elektroprivreda Bosne i Hercegovine d.d. -Sarajevo THERMAL POWER PLANT KAKANJ , KAKANJ   Izdanje br.: 1 Izdava č : TE Kakanj OUK 74/03-04 Strana : 3/46 2.7   CRITERIA FOR THE SELECTION OF THE MOST FAVOURABLE BID..........................................................13   2.7.1   The selection of the most favourable bid.......................................................................................................13   2.7.2   Tolerances for the technical data...................................................................................................................14   2.7.3   Non-acceptance of the Unit...........................................................................................................................14   TS3.   GENERAL DESCRIPTION OF PROJECT AND DETAILED REQUIREMENTS FOR MVSWITCHGEAR..........................................................................................................................................15   3.1   SCOPE AND LIMITS OF BIDDING......................................................................................................................15   3.1.1   Scope of delivery...........................................................................................................................................15   3.2   TECHNICAL REQUIREMENTS FOR MV SWITCHGEAR.................................................................................15   3.2.1   Switchgear Type............................................................................................................................................15   3.2.2   Cubicle design...............................................................................................................................................15   3.2.3   Enclosure.......................................................................................................................................................15   3.2.4   Busbar compartment......................................................................................................................................16   3.2.5   Switching device compartment.....................................................................................................................16   3.2.6   Interlocks.......................................................................................................................................................16   3.2.7   Connection compartment...............................................................................................................................17   3.2.8   Low voltage compartment.............................................................................................................................17   3.3   TECHNICAL REQUIREMENTS FOR CHANGE OVER DEVICE......................................................................19   3.3.1   Functional description...................................................................................................................................19   3.3.2   Description of Hardware...............................................................................................................................19   3.4   TECHNICAL DOCUMENTATION FOR MV SWITCHGEAR.............................................................................20   3.4.1   General notes about technical documentation...............................................................................................20   3.4.2   Technical documentation with offer..............................................................................................................20   3.4.3   Technical documentation with delivery.........................................................................................................20   3.4.4   Program support............................................................................................................................................21   3.5   TECHNICAL SPECIFICATIONS TABLE.............................................................................................................22   3.6   SINGLE LINE DIAGRAM......................................................................................................................................25   TS4.   GENERAL DESCRIPTION OF PROJECT AND DETAILED REQUIREMENTS FOR LVSWITCHGEAR..........................................................................................................................................26   4.1   SCOPE AND LIMITS OF BIDDING......................................................................................................................26   4.1.1   Scope of delivery...........................................................................................................................................26   4.2   TECHNICAL REQUIREMENTS FOR LV SWITCHGEAR..................................................................................26   4.3   TECHNICAL DOCUMENTATION FOR LV SWITCHGEAR..............................................................................27   4.3.1   General notes about technical documentation...............................................................................................27   4.3.2   Technical documentation with offer..............................................................................................................27   4.3.3   Technical documentation with delivery.........................................................................................................27   4.3.4   Program support............................................................................................................................................27   4.4   TECHNICAL SPECIFICATIONS TABLES...........................................................................................................28   4.5   SINGLE LINE DIAGRAMS....................................................................................................................................36   TS5. DISTRIBUTION TRANSFORMERS 6/0,4 kV..........................................................................................40   5.1   SCOPE AND LIMITS OF BIDDING......................................................................................................................40   5.2   STANDARDS AND CODES...................................................................................................................................40    Public Entreprise Elektroprivreda Bosne i Hercegovine d.d. -Sarajevo THERMAL POWER PLANT KAKANJ , KAKANJ   Izdanje br.: 1 Izdava č : TE Kakanj OUK 74/03-04 Strana : 4/46 5.3   DESIGN....................................................................................................................................................................40   5.4   DOCUMENTATION...............................................................................................................................................40   5.4.1   General notes about technical documentation...............................................................................................40   5.4.2   Contents of the delivered documentation......................................................................................................40   5.5   PACKAGING AND TRANSPORTATION.............................................................................................................41   5.6   DETAILED TECHNICAL REQUIREMENTS.......................................................................................................41   5.6.1   Boiler and cover............................................................................................................................................41   5.6.2   Transformer windings and oil........................................................................................................................41   5.6.3   Bushings and accessories...............................................................................................................................41   5.6.4   Oil conservator..............................................................................................................................................41   5.6.5   Name-plates...................................................................................................................................................41   5.6.6   Transformer signaling...................................................................................................................................42   5.7   TECHNICAL SPECIFICATION TABLE FOR TRANSFORMERS 6/0,4 kV.......................................................43  
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x